reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.
A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).
Based on the text above, judge the following items.
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.
A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).
Based on the text above, judge the following items.
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.
A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).
Based on the text above, judge the following items.
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.
A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).
Based on the text above, judge the following items.
A mensagem InformRequest do SNMPv2 permite a uma entidade agente notificar a uma entidade gerente, sem ter recebido solicitação dessa entidade, a ocorrência de um evento inesperado, tratando-se de um mecanismo fundamental para as atividades de gerência de falhas na rede.
Em SNMPv2, a mensagem GetBulkRequest é enviada de uma entidade gerente para outra entidade gerente para pegar grandes blocos de dados da MIB.
Para os dispositivos gerenciados, a implementação dos objetos do grupo system da MIB SNMP é opcional.
O tipo de dados Gauge32, usado em SNMP, corresponde a um número inteiro para contagens crescentes e decrescentes do valor 0 ao valor 232-1, inclusos.
Os dados de gerenciamento do protocolo SNMP são codificados para transmissão usando as regras do padrão external data representation (XDR).
Uma autoridade certificadora tem a função básica de vincular uma chave pública a uma determinada entidade, validando a identificação dessa entidade e emitindo certificados assinados digitalmente e garantindo a vinculação da chave pública com a entidade em questão.
Para utilização do protocolo de autenticação do cabeçalho AH (authentication header) do protocolo IPSec, o cabeçalho AH é inserido entre o cabeçalho IP original e a área de dados do datagrama, sendo o campo de protocolo do cabeçalho original alterado para o número 51 (protocolo AH) e o campo de próximo cabeçalho do cabeçalho AH alterado para o valor até então veiculado no campo de protocolo do cabeçalho original.
O protocolo secure sockets layer (SSL) fornece uma funcionalidade de criptografia seletiva de campos da informação trocada entre o cliente e o servidor de uma sessão SSL.
O servidor de autenticação kerberos é uma central de distribuição de chaves, que serve não apenas como repositório de chaves secretas de todos os usuários, mas também das informações sobre quais usuários têm acesso privilegiado a quais serviços em quais servidores de rede.
A possibilidade de emprego de uma placa ethernet em modo promíscuo é, ao mesmo tempo, uma funcionalidade de grande utilidade e uma vulnerabilidade desse tipo de rede.
Uma sessão nula (null session) é um modo de conexão entre computadores Windows NT e Windows 2000 operando em uma rede local em que os próprios sistemas operacionais apresentam um par de parâmetros, o identificador e a senha, para realizar uma autenticação mútua segura.
Um fluxo de programa (program stream) MPEG-2 é usado para multiplexar fluxos elementares que têm uma base de tempo comum e devem ser mostrados de forma sincronizada.
A porta-padrão do servidor do protocolo HTTPS é a de número 80.
Os pacotes do real time control protocol (RTCP) são enviados periodicamente e contêm relatórios com dados estatísticos que podem ser úteis para o remetente e para o receptor em uma aplicação multimídia em tempo real.