Questões de Concurso Público OGMO-Santos - SP 2025 para Trabalhador Portuário Avulso - Categoria Capatazia

Foram encontradas 10 questões

Q3992679 Inglês
ONE shows China an alternative way to power ships at port


Japanese containerline Ocean Network Express (ONE) has for the first time utilised shore power during lift-on and lift-off operations of an alternative marine power (AMP) container in a Chinese port.

This was done ahead of a symposium which shared best practices and explored innovative approaches to shore power utilization.

Before the symposium, ONE held a trial and commissioning of its AMP container at Ningbo Zhoushan Port Group's terminal. This approach is a proven method of reducing emissions while in port. 

When vessels equipped with AMP facilities which do not have a fixed type cable reel or an onboard AMP container arrive at a port, a containerized AMP unit stored at the terminal is lifted onto the vessel to enable shore power connection. Before the vessel departs, the AMP container is lifted off.

"The use of an AMP unit is a familiar and effective approach within this industry. To be successful, close cooperation among various concerned parties is necessary. We believe this will contribute to carbon footprint reduction in a practical and expedited way, and hope it is a good symbol of collaboration among relevant parties," said Hiroki Tsujii, ONE's global chief officer.

During the symposium, attendees witnessed a live demonstration of the AMP container and shore power usage on a vessel equipped with an AMP container − a vessel successfully connected to shore power and the country's first ship-shore collaborative mobile AMP container power connection mode after its commissioning.


https://tinyurl.com/245pdsmp 
What happens to the AMP container after it has been used on a vessel?
Alternativas
Q3992680 Inglês
ONE shows China an alternative way to power ships at port


Japanese containerline Ocean Network Express (ONE) has for the first time utilised shore power during lift-on and lift-off operations of an alternative marine power (AMP) container in a Chinese port.

This was done ahead of a symposium which shared best practices and explored innovative approaches to shore power utilization.

Before the symposium, ONE held a trial and commissioning of its AMP container at Ningbo Zhoushan Port Group's terminal. This approach is a proven method of reducing emissions while in port. 

When vessels equipped with AMP facilities which do not have a fixed type cable reel or an onboard AMP container arrive at a port, a containerized AMP unit stored at the terminal is lifted onto the vessel to enable shore power connection. Before the vessel departs, the AMP container is lifted off.

"The use of an AMP unit is a familiar and effective approach within this industry. To be successful, close cooperation among various concerned parties is necessary. We believe this will contribute to carbon footprint reduction in a practical and expedited way, and hope it is a good symbol of collaboration among relevant parties," said Hiroki Tsujii, ONE's global chief officer.

During the symposium, attendees witnessed a live demonstration of the AMP container and shore power usage on a vessel equipped with an AMP container − a vessel successfully connected to shore power and the country's first ship-shore collaborative mobile AMP container power connection mode after its commissioning.


https://tinyurl.com/245pdsmp 
What is the main purpose of using the AMP container during lift-on and lift-off operations in the Chinese port?
Alternativas
Q3992681 Inglês
ONE shows China an alternative way to power ships at port


Japanese containerline Ocean Network Express (ONE) has for the first time utilised shore power during lift-on and lift-off operations of an alternative marine power (AMP) container in a Chinese port.

This was done ahead of a symposium which shared best practices and explored innovative approaches to shore power utilization.

Before the symposium, ONE held a trial and commissioning of its AMP container at Ningbo Zhoushan Port Group's terminal. This approach is a proven method of reducing emissions while in port. 

When vessels equipped with AMP facilities which do not have a fixed type cable reel or an onboard AMP container arrive at a port, a containerized AMP unit stored at the terminal is lifted onto the vessel to enable shore power connection. Before the vessel departs, the AMP container is lifted off.

"The use of an AMP unit is a familiar and effective approach within this industry. To be successful, close cooperation among various concerned parties is necessary. We believe this will contribute to carbon footprint reduction in a practical and expedited way, and hope it is a good symbol of collaboration among relevant parties," said Hiroki Tsujii, ONE's global chief officer.

During the symposium, attendees witnessed a live demonstration of the AMP container and shore power usage on a vessel equipped with an AMP container − a vessel successfully connected to shore power and the country's first ship-shore collaborative mobile AMP container power connection mode after its commissioning.


https://tinyurl.com/245pdsmp 
According to Hiroki Tsujii, what is essential for the successful use of the AMP container in ports?
Alternativas
Q3992682 Inglês
During port operations, a key factor is ensuring that cargo is evenly distributed within a ship to maintain balance and stability. This process involves monitoring the weight and placement of goods to prevent issues such as tilting or capsizing during the voyage. Ports often employ technology and personnel to oversee this critical task. What is the term for this process?
Alternativas
Q3992683 Inglês
During a busy day at the port, a vessel's arrival time has been updated because of heavy traffic in the harbor. The port authority needs to communicate this change clearly using the future tense to ensure that all operations are adjusted accordingly. The vessel is now expected to dock at 6:30 p.m., and this change must be reflected in the official announcement. Which sentence correctly uses the future tense to describe the new docking schedule? 
Alternativas
Q3992684 Inglês
In a busy port environment, communication between the ship's crew and port authorities is crucial for efficient operations. Read the following dialogue and answer the question:
Port Authority: "Good morning, Captain. Your vessel is scheduled to dock at Berth 7, but due to ongoing maintenance, we'll need to redirect you to Berth 3. Please confirm your estimated time of arrival."
Captain: "Good morning. Thank you for the update. Our ETA is 14:30, and we will adjust our course accordingly. Please advise if there are any additional instructions."
Port Authority: "Understood. Ensure that your crew is ready for immediate unloading upon arrival. The stevedores will be waiting."

What is the primary purpose of this dialogue?
Alternativas
Q3992685 Inglês
In a port, it is common to see workers communicating with each other using clear and precise instructions to ensure safety during operations. Imagine a scenario where a worker is signaling to stop the movement of a crane carrying heavy cargo. The worker shouts, "Stop immediately! The load is unstable." What is the correct verb form to describe the worker's action of signaling the crane operator? 
Alternativas
Q3992686 Inglês

Read the dialogue below carefully:


A: "Good morning, Captain. The weather forecast shows strong winds in the evening."

B: "Thank you. Let's adjust the route to ensure the ship avoids the storm."


What is the purpose of the dialogue?

Alternativas
Q3992687 Inglês
Ships need assistance when navigating narrow channels or docking in busy ports to avoid accidents and ensure precise maneuvers. A small but powerful vessel is often used for this purpose, pushing or pulling the ship into position. This vessel is critical for the safe handling of large ships in tight spaces. What is this vessel called? 
Alternativas
Q3992688 Inglês
Choose the correct sentence to complete the dialogue.  A: "Have you seen Mark today?"  B: "Yes, I _____ him at the coffee shop this morning." Select the correct alternative:
Alternativas
Respostas
1: D
2: D
3: E
4: E
5: D
6: A
7: E
8: D
9: C
10: B