One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
The plan is supposed to include the likelihood of failure, its results and the actions to be taken to contain development risk.
Alternativas
Q43309 Inglês
One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
At the beginning of the second paragraph, "should" can be correctly replaced by ought to.
Alternativas
Q43310 Segurança da Informação
Com relação à segurança da informação, julgue os
seguintes itens.
Confiabilidade é tornar uma informação disponível no momento em que ela se torna necessária.
Alternativas
Q43311 Segurança da Informação
Com relação à segurança da informação, julgue os
seguintes itens.
Uma informação será considerada íntegra quando seu conteúdo não tiver sido lido por entidade não-autorizada, seja esta um sistema ou uma pessoa.
Alternativas
Q43312 Segurança da Informação
Com relação à segurança da informação, julgue os
seguintes itens.
Um elemento fundamental a ser considerado no mundo eletrônico atual é a disponibilidade da informação, ou seja, informação para as pessoas autorizadas na hora que dela precisarem.
Alternativas
Respostas
16: C
17: C
18: E
19: E
20: C