Questões de Concurso Sobre inglês

Foram encontradas 26.313 questões

Q152305 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

Real work experience is all that’s needed to develop managerial characteristics as those discussed in the text.
Alternativas
Q152304 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

Today, many schools are not preparing future workers the right way.
Alternativas
Q152303 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

Lots of business schools still insist on focusing only on the development of analytical abilities.
Alternativas
Q152301 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

It’s much better to have trustworthy workers than very clever ones.
Alternativas
Q152300 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

The workers’ success depends on how good things come to happen.
Alternativas
Q152299 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

Employees must be genuinely humble persons and show concern for other people.
Alternativas
Q152298 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

Workers are expected to be faithful to their organizations.
Alternativas
Q152297 Inglês
Imagem 009.jpg

Based on the text above, judge the items below.

Most organizations are now interested in reasonably intelligent workers and who work hard.
Alternativas
Q149204 Inglês
          One frequently overlooked area in planning is technical reviews and inspections. A technical review requires substantial preparation on the part of the presenters. Documents must be published and distributed and presentation material organized and made into slides or overheads. Practice sessions are conducted by presenters with an audience of critics to prepare for the review.
              The reviewers should read the material, attend the presentations, and write reports. On large projects with many reviews and walk-throughs involving many participants, a substantial number of labor hours can be consumed analyzing documents, attending meetings, and writing reports. For example, a system design review for one module or unit can require 150 labor hours. When overlooked, this labor can result in a very large error in resource and schedule estimation.
          Many projects include risk assessment and risk management as a key part of the planning process and expect the plan to identify specific risk areas. The plan is expected to quantify both probability of failure and consequences of failure and to describe what will be done to contain development risk.
                                 A. Behforooz and F. Hudson. Software engineering fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
Some audiovisual materials are required for the presentation of issues to be dealt with.
Alternativas
Q149203 Inglês
          One frequently overlooked area in planning is technical reviews and inspections. A technical review requires substantial preparation on the part of the presenters. Documents must be published and distributed and presentation material organized and made into slides or overheads. Practice sessions are conducted by presenters with an audience of critics to prepare for the review.
              The reviewers should read the material, attend the presentations, and write reports. On large projects with many reviews and walk-throughs involving many participants, a substantial number of labor hours can be consumed analyzing documents, attending meetings, and writing reports. For example, a system design review for one module or unit can require 150 labor hours. When overlooked, this labor can result in a very large error in resource and schedule estimation.
          Many projects include risk assessment and risk management as a key part of the planning process and expect the plan to identify specific risk areas. The plan is expected to quantify both probability of failure and consequences of failure and to describe what will be done to contain development risk.
                                 A. Behforooz and F. Hudson. Software engineering fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
The presenters should be duly prepared to take part in a technical review.
Alternativas
Q149202 Inglês
          One frequently overlooked area in planning is technical reviews and inspections. A technical review requires substantial preparation on the part of the presenters. Documents must be published and distributed and presentation material organized and made into slides or overheads. Practice sessions are conducted by presenters with an audience of critics to prepare for the review.
              The reviewers should read the material, attend the presentations, and write reports. On large projects with many reviews and walk-throughs involving many participants, a substantial number of labor hours can be consumed analyzing documents, attending meetings, and writing reports. For example, a system design review for one module or unit can require 150 labor hours. When overlooked, this labor can result in a very large error in resource and schedule estimation.
          Many projects include risk assessment and risk management as a key part of the planning process and expect the plan to identify specific risk areas. The plan is expected to quantify both probability of failure and consequences of failure and to describe what will be done to contain development risk.
                                 A. Behforooz and F. Hudson. Software engineering fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
Technical reviews and inspections are two areas which are often looked over.
Alternativas
Q126947 Inglês
Imagem 068.jpg

Based on the text, it can be concluded that

prototyping can be used in more than one sense.
Alternativas
Q126946 Inglês
Imagem 068.jpg

Based on the text, it can be concluded that

software engineers can be part of prototyping efforts whenever prototyping is required.
Alternativas
Q126945 Inglês
Imagem 068.jpg

Based on the text, it can be concluded that

software engineers’ active participation includes to meet users when they get together.
Alternativas
Q126944 Inglês
Imagem 068.jpg

Based on the text, it can be concluded that

software engineers should necessarily take active participation in every single step of the system design so as to make it succeed.
Alternativas
Q126943 Inglês
Imagem 068.jpg

Based on the text, judge the items from 111 through 116.

The word prototyping is used to refer to a physical model of a trivial portion of the system to assure that a certain demand can be fulfilled.
Alternativas
Q126942 Inglês
Imagem 068.jpg

Based on the text, judge the items from 111 through 116.

Design means that the system design starts to move its focus from how it is to be built to what is to be built.
Alternativas
Q126941 Inglês
Imagem 068.jpg

Based on the text, judge the items from 111 through 116.

The definition for design as found in a dictionary can be misleading in the case presented.
Alternativas
Q126940 Inglês
Imagem 068.jpg

Based on the text, judge the items from 111 through 116.

The initial step might prefer a decentralized architecture to a centralized one.
Alternativas
Q126939 Inglês
Imagem 068.jpg

Based on the text, judge the items from 111 through 116.

The first step in the system must be the setting up of the underlying structure after considering multiple options.
Alternativas
Respostas
25401: C
25402: C
25403: E
25404: C
25405: E
25406: E
25407: C
25408: C
25409: C
25410: C
25411: E
25412: C
25413: C
25414: C
25415: E
25416: E
25417: E
25418: C
25419: C
25420: E